- N-18
Borrow pit volume vs. on-site cut: two different numbers in a haul plan
Cut volume and borrow quantity measure different things. Mixing them up throws off haul counts, truck scheduling, and the pay app line items.

- N-17
Field notes: the week erosion ate a week's worth of cut, and the GC called it theft
A storm moved dirt nobody hauled, and the pay app numbers took the blame. What weekly surface capture shows when erosion eats a week's cut.

- N-16
How to size a haul truck fleet from a weekly cut volume report
A worked method for turning a weekly cut volume into a truck count: cycle time, bed capacity, swell, and where the errors creep in.

- N-15
What is an import/export balance on an earthwork job?
What an import/export balance means on an earthwork job, how it's calculated, and why it drives your haul plan and pay app numbers.

- N-14
Field notes: the stockpile that disappeared between two Tuesday flights
A foreman's trucking sheet and a vanished stockpile didn't add up. Two weekly drone flights showed where the yards actually went.

- N-13
Separating topsoil strip volume from subgrade cut on a pay app
How to split topsoil strip volume from subgrade cut on a pay application using separate surface comparisons instead of a percentage guess.

- N-12
Attaching a drone volume report to your AIA pay application
How to attach a drone-based cut/fill volume report as G703 backup, matched to your schedule of values line items.

- N-11
What a digital surface model is, and why earthwork volume surveys need two of them
A DSM captures ground elevation at one moment. A cut/fill volume comes from differencing two of them, before the cut and after.

- N-10
Field notes: the week the load count didn't match the pad
A field-notes piece on the week a dirt sub's load count drifted from reality, and why nobody flagged the gap until the pay app was already due.

- N-09
How to document a differing site condition with drone survey volumes
Building a differing site condition claim that survives review: what surface-to-surface volume evidence needs to show and why load counts don't hold up.

- N-08
What counts as unclassified excavation on an earthwork bid
What unclassified excavation covers on a bid item, how it differs from classified dirt work, and why it matters at pay app time.

- N-07
What is a haul distance band, and why it changes your trucking bid
Haul distance bands set trucking cost tiers for earthwork. Here's how one-way distance, not volume, drives what your hauler bids.

- N-06
Drone volume survey vs GPS machine control for verifying moved material
A field comparison of drone volume survey and GPS machine control data for checking a dirt sub's load counts on a pay app.

- N-05
What is swell factor, and why it changes your truck count
Bank yards versus loose yards, swell percentage by soil type, and why swell factor throws off your haul truck count if you ignore it.

- N-04
Bank yards vs compacted yards: why the numbers never match on your pay app
Bank cubic yards, compacted yards, swell factor, shrinkage factor: what each term means and why they never add up to the same number.

- N-03
Cross-section takeoff vs. surface-to-surface volumes: what holds up on a pay app
How manual cross-section takeoff compares to surface-to-surface drone volume takeoff, and which one a GC can defend on a pay application.

- N-02
Load tickets don't match the survey? How to true up the pay app
Scale tickets and the engineer's topo rarely land on the same number. Here's how to reconcile them before the pay app goes in.

- N-01
What is a mass haul diagram? Reading the curve that runs your earthwork
A mass haul diagram plots cumulative cut/fill along an alignment. How it's built, what the balance point means, and free haul vs overhaul.